Home >> Case Studies - Oil and Gas

Oil & Gas

Hummingbird Portal - Conoco Phillips

conocologoHummingbird partner Cad-Capture, a British system integrator with a longstanding relationship with the Humber Refinery, recommended a solution based on Hummingbird Portal, the enterprise information portal solution from Hummingbird that offers organizations a solid platform for building e-Business solutions while leveraging and rejuvenating existing investments in enterprise resources and applications.

Hummingbird Portal provides Conoco with a common front-end view to a variety of applications used within Conoco and meets the objective of providing a unified interface through which users can view, search and work on documents in all repositories. Particular priority was placed on the ability to search and access SAP-related content residing in the document management system directly from the ERP application...

To read more download the case study

Quality Assurance - Nigeria LNG

logo-lngNigeria LNG Limited is jointly owned by Nigerian National Petroleum Corporation, Shell, Total and Eni. It was incorporated in 1989 to harness Nigeria’s vast natural gas resources and produce Liquefied Natural Gas (LNG) and Natural Gas Liquids (NGLs) for export from the LNG Plant Complex, Bonny Island. In 1999, Nigeria LNG (NLNG) invited tenders for the redraw of all its 341 Process Engineering Flow Scheme (PEFS) drawings.

The contract was awarded to an offshore company due to the low price tendered. Unfortunately on completion of the contract NLNG became aware of serious quality issues with the drawings. Errors found included; Tag Nos; Equipment Nos; Line Nos; Class Nos; line types; layering; line thickness; arrow direction; revision status; text styles and height; dimensions; symbols; attributes.

NLNG sought advice from Shell, one of its owners, who recommended that the entire 341 PEFS should go through an independent Data Validation and Quality Checking exercise. Furthermore, Shell recommended Cad-Capture as a solutions provider, having successfully redrawn 2000 PEFS for Shell UK Stanlow Refinery in 1997.

To read more download the case study